U.S. Army Corps – Fort Riley Railyard

Project Summary:

Milord was contracted by the USACE to build 34,000 track feet of loading, offloading and storage track for military equipment. The project included the furnishing and installation of all track construction, earthwork, storm water piping, box culvert, railroad bridge, soil nail retaining wall, concrete slope wall, access roads, sub ballast, electrical and High Mast light towers.