Site Overlay

Processing Expansion Project

Client – Confidential
Location – Confidential
Relationship – Since 2017

Project Summary:

A 10,000 SF partial renovation of an existing / operating food plant to create a new raw and RTE processing space, including new process waste floor drains, wearing slab, machine/equipment pads, SS IMP walls and ceilings, protective concrete curbing, SS food grade doors, acid brick flooring, urethane floor coatings, heated make-up air and exhaust, process air and steam. This also entailed upgrades to the existing waste water system, increasing the condenser capacity, as well as the addition of an ammonia spiral freezer and refrigerated rooms along with an expansion of the existing ammonia engine room.

Milord Company is continuing to work with this client on multiple projects to further expand their capabilities.